Page 127 - ΕΛΛΗΝΙΚΗ ΑΕΡΟΠΟΡΙΚΗ ΒΙΟΜΗΧΑΝΙΑ - 50 ΧΡΟΝΙΑ | HELLENIC AEROSPACE INDUSTRY - 50 YEARS
P. 127
the undertaking of manufacturing work for the assembly of three sub-constructions of the cen- tral wing of the 757 aircraft, worth $25.2 million, with a completion deadline of 10 years.
• Airbus: HAI signed successive contracts with Aerospatiale and later its successor companies EADS and Airbus for a variety of manufacturing projects:
– Airbus 300/310: continuation of the 1980s program for the manufacture of passenger door frames
– Airbus 320: manufacture of luggage door frames
– Airbus 330/340: manufacture of floor sup- port beams
• Alenia: In 1998, HAI signed an Memorandum Of Understanding (MOU) with the Italian Alenia Aeronautica for the co-production of the C-27J transport aircraft, with the manufacture of the loading ramp and cargo doors for the C-27J.
electronics and telecommunications
the HAI’s electronics operational unit grew rapidly during the period under consideration. According to estimates by the associated services, the unit handled programs worth a total of €480 million. the development of its production for the Armed Forces included the manufacture, assembly, and maintenance of a range of electronic products, such as the HAWK anti-aircraft batteries and the
the diAs tactical-technical
Fire control system
(© Hellenic Aerospace industry s.A.)
the 1990s and 2000s
03
127

